Concrete Driveway Cost in North Carolina
Cost to pour a new concrete driveway, by square footage.
Low$3,360
Average$6,720
High$13,440
North Carolina-adjusted range, price per total project
Low$3,360
Average$6,720
High$13,440
Overview
Concrete driveway cost is priced per square foot and depends on thickness, finish, reinforcement, and site prep required (grading, old driveway removal).
Why North Carolina prices differ
Freeze-thaw climates require thicker slabs and proper reinforcement, raising cost. Removal of an old asphalt or concrete driveway adds to the total in any region.
Frequently asked questions
How long does concrete need to cure before use?
Concrete is typically safe to walk on after 24-48 hours, but should cure for about a week before driving on it.
Concrete Driveway cost by city in North Carolina
| City | Low | Average | High |
|---|---|---|---|
| Charlotte | $3,400 | $6,790 | $13,580 |
| Raleigh | $3,400 | $6,790 | $13,580 |